Full Map of All Projects

Current City Projects

Sorted by Project Type, Start Date
Legend (Click on specific project type to just show that type)
Project Types
(count)
City of Coconut Creek
(14)
Other Government Agency
(0)
Private Development
(6)
Special Events
(4)
 
Project NameProject DescriptionResponsible PartyLocationCost/
Funding
Potential IssuesStatusImportant
Dates
Contact
Info
Map
TREE CANOPY REPLACEMENT PROGRAM Replacing street trees in neighborhoods througout the City Sustainable Development City-wide $200,000 Selected Neighborhoods: Coral Pointe, Huntington Square West, Hammock Estates, Sorbet Villas and Parkwood VI Agreement for services scheduled for consideration for Commission meeting 10/23/14. Estimated contract amount $86,000. Contractor to install and provide approximately 415 assorted trees
Start
2/1/2011
Contact Info GIS Map
SINGLE STREAM RECYCLING Grant program with funds to go towards outreach, education, and implementation of multi-family and commercial recycling pilot programs. Public Works city-wide $599,000 (Broward County Grant) County approved additional grant funds beyond 7/13.Commercial recycling carts delivered. A multi-family recycling contest pilot program will take place in Wynmoor (Bimini) this December. Staff held a multi-family recycling community outreach event at Broadstone apartments. This Project is completed.
Start
9/1/2011
Contact Info GIS Map
ELECTRIC VEHICLE CHARGING STATIONS This project involves the installation of Electric Vehicle Charging Stations at select City Facilities to provide local re-charging facilities and to further promote the use of alternative fuel vehicl Public Works Throughout the City   Vendor selected Govt Center site to install the 1st station once approved by the City Commission Installation of vehicle charging station is completed. Appropriate signage has been ordered but not yet received. Working with Community Relations to develop press release and video.
Start
1/9/2012
Complete
9/30/2013
Contact Info GIS Map
CITY HALL RENOVATIONS This project involves the re-configuring of space usage in certain areas of City Hall to accommodate current needs as well as upgrading the lighting and HVAC systems, ceiling repairs, remodeling the bathrooms, replacing carpeting and exterior doors, and refinishing the breezeway decking. Public Works City Hall $500,000   100% plans have been submitted for permitting. Demolition activities are 100% complete. Pre-construction meeting has been scheduled.
Start
1/21/2012
Contact Info GIS Map
FIRE STATION 94 REMODEL This project involves the remodel of Fire Station #94 to accommodate current needs including the dormitory area, kitchen, offices and work space. Public Works 4555 Sol Press Boulevard Coconut Creek 33073 $240,000   Temporary trailer to be delivered within the next week. Construction to begin shortly thereafter.
Start
1/2/2013
Complete
4/30/2015
Contact Info GIS Map
EARL JOHNS PROPERTY REMODEL Project involves rehabilitation of the Earl Johns House to prepare for resale and/or renting of property. Includes but is not limited to remodel of kitchen and one bathroom, new flooring (carpet and tile), celing and screen repairs, and painting. Public Works 651 NW 45th Avenue $55,000   Clean up complete. Awaiting final decision on property use/disposition before undertaking further renovations
Start
6/1/2013
Contact Info GIS Map
TELEMETRY-SCADA SYSTEM IMPROVEMENTS Install new telemetry equipment (cellular) and program the Supervisory Control and Data Acquisition (SCADA) and Program Logic Control (PLC) system. Utilities and Engineering City entire wastewater lift station sites and water storage tanks. $1,020,300   All lift station sites installation completed. Hilton and Hillsboro water sites startups in progress. Project is 90% completed.
Start
6/10/2013
Complete
11/16/2014
Contact Info GIS Map
SABAL PINES PARK SERVICE ACCESS PATH This project involves the replacement of the existing 5 foot wide asphalt sidewalk with a 12 foot wide reinforced concrete multipurpose path and includes other site amenities such as interpretive signs, benches, bike racks, and trash/recycling receptacles. This project is partially funded with an FDEP grant Public Works 5005 NW 39 Avenue $246,000   Paperwork submitted to State for grant reimbursement.
Start
9/1/2013
Complete
3/31/2014
Contact Info GIS Map
EDUCATION CORRIDOR (SIDEWALKS) Phase III The project includes sidewalks, landscaping, irrigation, hardscape, and transit facilities on either side of Coconut Creek Parkway between the Turnpike and Banks Road. Utilities and Engineering Coconut Creek Parkway, Banks Road to Broward College entrance on east. $2,963,606 grant FDOT (-CEI) City: $521,394   Landscape installation and completion of sidewalks, curbs and gutters are in progress. No other known issues at this time.
Start
9/26/2013
Complete
11/14/2014
Contact Info GIS Map
SHADE STRUCTURE INSTALLATION This project provides for the installation of shade structures at 8 different locations throughout the City including the Community Center Playground, Sabal Pines Park West Playground, Gerber Park Bleachers, Lakeside Park Bleachers, and Hosford Park Bleachers. Public Works Citywide $286,000   Lakeside Park and Hosford Park Bleaches have been completed. Community Center Playground and Gerber Park Bleachers are currently in the works.
Start
10/1/2013
Complete
2/28/2015
Contact Info GIS Map
SHADE AWNING REPLACEMENT This project provides for the replacement of shade awnings that are torn, faded and beyond repair. The Community Transportation storage area awning is scheduled for replacement in FY2014 Public Works $15,000   The FY2014 shade awning replacement was completed and we are now starting to obtain quotes for the FY2015 shade awning replacements at Lakeside Park.
Start
10/1/2013
Contact Info GIS Map
PARKS IMPROVEMENT PROGRAM This project addresses capital rehabilitation needs at various City parks,which includes, but not limited to, replacement of roofs, scoreboards, fencing, sport field and pathway lighting, restrooms upgrades, court resurfacing, Community Center and Recreation Complex upgrades, etc. Public Works Various projects will take place at Sabal Pines Park (5005 NW 39 Ave), Gerber Park (4715 NW 30 St), Lakeside Park (5555 Regency Lakes Blvd), and the Community Center (1100 Lyons Road). Budget: $597,000   FY-2014 improvements completed include painting of the community Center Bridge, fence fabric replacement at Lakeside and Gerber Parks, and scoreboard replacements at Sabal Pines Park fields 1 and 2. Currently working on FY-2015 projects.
Start
11/1/2013
Contact Info GIS Map
NW 42 AVE. TRAFFIC CALMING IMPROVEMENTS Replacement of existing asphalt sidewalk with concrete sidewalk, drainage improvemnets, traffic device installations, and pedestrian improvements. Utilities and Engineering On the west side of 42nd Avenue from 30th Street to approximately 65 feet south of the bridge $119,945,000 Fund: 11715416856   Landscape restoration completed. Handrail submittals approved. Solar beacon lights had been modified per new B.C. and FDOT standards. Revised shop drawings-plans approved by BC 9/23/14. Handrails and transition sidewalk installations scheduled 10/23/14.
Start
3/3/2014
Complete
11/14/2014
Contact Info GIS Map
SOUTH CREEK DREDGING Dredge approximately 8,000 cubic yards from South Creek Canal and dispose of spoil material in geotubes that will be stacked along the canal shoreline. Utilities and Engineering South Creek Canal $300,000 grant-Cocomar District $303,000 City   Project is 30% completed.
Start
5/7/2014
Complete
5/7/2015
Contact Info GIS Map
LONG PINES TOWNHOMES Construction of fifty (50) residential townhome units. Jordan Klemow-Kemlow at 5150 Hillsboro, Inc. 5150 W. Hillsboro Blvd. - currently vacant     Active Construction
Complete
12/1/2015
Contact Info GIS Map
CASA PALMA Approval of 14 three-story buildings, clubhouse and recreational areas for 350 multi-family luxury rental units. ZOM Florida, Inc., 200 E. Broward Blvd., Ft. Laude 6320 N. SR 7     Active Construction. Four buildings left to CO
Start
1/1/2013
Complete
12/1/2014
Contact Info GIS Map
PROMENADE AT COCONUT CREEK: SILVERSPOT THEATRE New 11 screen movie theater and restaurant. Garrison Investment Group SW corner of Lyons Road and Wiles Road. $11.3 million   Building shell under construction. Interior build out construction permit awaiting final reviews and approval.
Start
12/1/2013
Complete
12/31/2014
Contact Info GIS Map
GUNTHER VOLKSWAGEN Expansion to allow for additional service area, expand pre-owned sales building and construct parking structure for inventory. Gunther Motor Company 4300 North State Road 7 (MainStreet Project Area) $7.3 million   Project nearly complete. Expect Certificate of Occupancy in October 2014.
Start
12/31/2013
Complete
10/31/2014
Contact Info GIS Map
BANK UNITED Requesting site plan and special land use approvals for a modification to the site plan and architecture of an existing outparcel building at Coconut Creek Plaza to add drive thru facilities for a new bank tenant. Byron Wilson-Bixmor Property Group 4801 Coconut Creek Parkway-NW corner of Lyons Rd and Coconut Creek Parkway Unknown   Exterior work almost completed. Interior build-out under construction.
Start
12/31/2013
Contact Info GIS Map
PUBLIC STORAGE AT ALTIS Four Story self-storage building Public Storage One Inc 5479 Wiles Road $6.4 million   Project under Construction. After hours permits issued.
Start
1/1/2014
Contact Info GIS Map
MOVIE IN THE PARK SERIES Free movie series runs from November thru April and occurs the third Friday of the month. Each month is a different PG or G rated movie. You may bring lawn chairs or blankets. Coolers are welcomed, however a food truck will be on site selling foold and beverages Parks and Recreation Various park locations. The movie will be shown in a different city park each month.   The movie in the park series will begin a new season on Friday, 11/16/13. The next Movie in the Park will be Friday, March 21, 2014. The movie will be DESPICABLE ME2, rated PG. It will be in the park behind the Community Center at 1100 Lyons Road. The movie begins at 8:00 PM. Please visit us at www.coconutcreek.net/events for complete schedule
Start
11/16/2013
Complete
4/30/2014
Contact Info GIS Map
HOME GROWN CONCERT - SOLID BRASS Free concert featuring Solid Brass, performing a tribute to the horn bands from the 60's to the 80's. Bring blankets or lawn chair. Food available for purchaser and coolers welcome. Parks & Recreation Dept Community Center, 1100 Lyons Road   Traffic should not be affected in any way. There is plenty of parking available at the Community Center. There is also an overflow lot across the bridge on 45th Avenue. The Home Grown Concert featuring Solid Brass on Sunday, November 9, from 4:00 pm to 5:30 pm
Start
11/9/2014
Complete
11/9/2014
Contact Info GIS Map
FALL HARVEST FESTIVAL Family country fair featuring: live music from Shane Duncan band (country). Handicraft Fair presented by Womens Club of CC. Beer Garden hosted by World of Beer CC. Food trucks, bounce houses, interactive games, maze, train ride, DJ Parks & Recreation Sabal Pines Park, 5005 NW 39th Avenue City Budget Limited parking available at Sabal Pines Park. The City is providing two free shuttle buses to take people from Monarch High School to the drop off at Winston Park Elementary for overflow Fair is from 2:00 PM to 6:00 PM. At 6:15PM, movie, "Free Birds" ends at 8:30 PM. Also will have Publix pumpkin patch, pie eating contests, line dancing, youth sports leagues
Start
11/22/2014
Complete
11/22/2014
Contact Info GIS Map
SENIOR EXPO Free event targeted towards the active senior, age 55 and older, but everyone is welcomed. Information, different types of medical screenings and new vendors. Light refreshments, raffles. Parks & Recreation Coconut Creek Community Center, 1100 Lyons Road   Friday, December 5, 2014 from 9:30 am to 12:30 pm. Ample parking available at the Community Center. City bus stops at the front entrance to the Community Center
Start
12/5/2014
Complete
12/5/2014
Contact Info GIS Map

Future City Projects

Sorted by Project Type, Start Date
Legend
Project Types
(count)
City of Coconut Creek
(10)
Other Government Agency
(0)
Private Development
(10)
Special Events
(0)
 
Project NameProject DescriptionResponsible PartyLocationCost/
Funding
Potential IssuesStatusImportant
Dates
Contact
Info
Map
LYONS ROAD MEDIANS SECTION II and III This project involves enhancements to the medians along Lyons Road between the Sawgrass Expressway and Copans Road including landscaping, brick pavers, and irrigation upgrades. Public Works Lyons Road between Copans Road and the Sawgrass Expressway Approx. $1,500,000 ($1,174,000 grant from FDOT)   Brick Pavers and irrigation system are roughly 98% complete, tree installation is 70% complete and sod installation is 45% complete. Project is 87% complete.
Start
8/1/2012
Complete
11/1/2014
Contact Info GIS Map
NW 74TH STREET PASSIVE PARK This project involves the development of the NW 74th Street property utilizing a combination of City and grant funds. Under the terms of the grant, the proposed park is designated as a passive park. In FY 2013, the City installed a pathway that runs along the perimeter of the park. Public Works $175,000   Construction underway with the parking lot portion 95% completed. Other work included electrical work related to the irrigation pump station, installation of the irrigation pump station and delivery system.
Start
2/1/2013
Complete
10/31/2014
Contact Info GIS Map
NEW FIRE STATION (South Creek) Project involves the construction of a new Fire Station in South Creek. The proposed station will be a two story building with three bays and approximately 10,000 sq.ft. in total size. Public Works Windmill Park, 700 Lyons Road $3,900,000 There may be occasional park ingress/egress issues once it is under construction. Other than that, do not anticipate any unusual circumstances. Currently reviewing construction bid submittals. City Commission consideration of the award of the construction contract to the lowest responsible and responsive bidder scheduled for the October 23rd Commission meeting.
Start
3/1/2013
Complete
2/28/2016
Contact Info GIS Map
WINDMILL PARK EXPANSION/EARL JOHNS PROPERTY DEMOLI This project involves rehabilitation of the Earl Johns House to prepare for resale and/or renting of property. Includes remodel of kitchen and one bathroom, new flooring (carpet and tile), ceiling and screen repairs, and painting. Pulblic Works Located on Lyons Road between Coconut Creek Parkway and Atlantic Blvd. $55,000   Currently negotiating fees with the top ranked Consulting firm for the design of the park improvements
Start
6/1/2013
Contact Info GIS Map
SABAL PINES PARK YARD RETROFIT Convert Public Works Sabal Pines Park maintenance yard into Utility Maintenance Compound Utilities and Engineering Sabal Pines Park $200,000 Design Contract date: 3/13 Anticipated Construction Start: 8/13 Anticipated Construction Completion: 3/14 Project on hold due to potential alternatives.
Start
8/13/2013
Complete
3/31/2014
Contact Info GIS Map
COPANS ROAD EAST MEDIAN IMPROVEMENTS This project provides for paver, landscape, and irrigation improvements for the Copans Road medians between Lyons Road and the Turnpike. Public Works Lyons Road to the Florida Turnpike $525,000   Plans have been submitted to Broward County for permitting.
Start
9/1/2013
Complete
9/30/2015
Contact Info GIS Map
BUS SHELTER PROGRAM This project provides for the installation of new and or replacement bus shelters as needed throughout the city. Shelters shall be consistent with the citys Amenities Package. Public Works Citywide $30,000   Currently working on vendor to provide engineered drawings for permitting purposes to install two shelters, one on Lyons Road at Wynmoor and one on Copans Road just east of Lyons Road.
Start
10/1/2013
Contact Info GIS Map
CITY ENTRYWAY SIGNS Project addresses the design and installation of new City Entryway signs at fifteen locations throughout the City in accordance with the Citys Amenities package. Public Works $290,000 This project is budgeted over several years with the first installation(s) in FY 14. Plans are currently at FDOT for permitting and staff is addressing associated comments.
Start
10/1/2013
Complete
9/30/2018
Contact Info GIS Map
WILES ROAD RECLAIMED WATER METERING STATION Construction of reclaimed water metering station and tie-in into Broward County reclaimed water main. Utilities and Engineering SE Corner of Wiles Road and 39th Avenue $100,000 Funding Source: 42915366828 Changes in the electrical design by the Consultant to incorporate solar power are in progress. Preparation of permit documents to work in Groward County's ROW's is in process. Construction is tentatively scheduled to start on 3/3/14.
Start
12/3/2013
Complete
5/16/2014
Contact Info GIS Map
RECLAIMED WATER MAIN EXTENSION ON LYONS RD Design of reclaimed water main extension on Lyons Road from Wiles Road to Serko Boulevard Utilites and Engineering On the east side of Lyons Road from Wiles Road to Serko Boulevard $120,000- 50/50 w/BC  
Start
2/6/2014
Complete
10/31/2014
Contact Info GIS Map
THE VILLAGE OF MARBELLA Approved site plan to allow for commercial, office, 150 room hotel, and 764 residential units. Pompano Imports, Inc. North side of Sample Road, jsut est of Lyons Road (MainStreet Project Area) $227 million (2008 costs) Start date unknown Approved-legal issues have project on hold
Contact Info GIS Map
IN THE PINES TOWNHOMES Construction of fifty-five (55) residential townhome units. Jordan Klemow Southeast corner of Hillsboro Blvd and NW 51st Terrace $8,355,000   In DRC Review
Complete
12/31/2016
Contact Info GIS Map
U-HAUL STORAGE AND RENTAL FACILITY Requesting site plan amendment and special land use approval to modify site and architecture and permit truck rental at an existing, vacant self-storage facility. U-Haul of Florida 5431 Johnson road - East of SR 7 unknown   Building permits have been picked up for corrections. Pending building permit issuance.
Contact Info GIS Map
NORTH BROWARD PREP SCHOOL Construction of two (2) story athletic/wellness center and baseball/softball fields relocation. North Broward Prep School-agent Scott Backman 7600 Lyons Road unkown   Site plan application currently under DRC review.
Complete
3/31/2015
Contact Info GIS Map
NORTH BROWARD PREPARATORY SCHOOL Rezoning and re-plat as required by pre-annexation agreement with City. Property to be zoned from Agricultural to Community Facility for consistency with the existing use. Plat will unify multiple parcels under one plat name and identify use dedications. Scott Backman-N.Broward Prep School 7600 Lyons Road     Rezoning and Plat Application currently under DRC review.
Contact Info GIS Map
HILLSBORO BAPTIST CHURCH and EDUCATIONAL FACILITY Requesting zoning modification and site plan approval of a multi-phased project which includes K-12 grade school, recreational space, and church facilities. First Baptist Church at Hillsboro, Inc. 5100 West Hillsboro Blvd - primarily vacant     Property Owner considering a reduced development scope prior to re-submittal. In DRC Review
Start
1/31/2013
Complete
1/31/2016
Contact Info GIS Map
AMERICAN TOP TEAM TRAINING FACILITY Construct new 2-story, 39,000 square foot mixed martial arts training facility and dorm-style living units for international competitors. Daniel Lambert 5000 State Road 7 Unknown   Building permits currently under review.
Start
10/31/2014
Contact Info GIS Map
MIDTOWN RESIDENCES AT COCONUT CREEK Proposed 308 midrise residential units within the MainStreet Project Area. Units include studios, 1,2, and 3 bedroom units from 677 to 1,293 sq.ft. Includes clubhouse, pool, garage parking and electric vehicle charging stations. Green elements include, solar panels, permeable pedestrian plazas and a cistern. Florida Crystals Corporation 4800-4900 block on Sample Road (MainStreet Project Area) $32 million   Project scheduled for City Commission 1st reading, 10/9, 2nd reading, 10/23
Start
10/31/2014
Complete
12/31/2016
Contact Info GIS Map
MERCEDES BENZ OF COCONUT CREEK Proposed expansion to existing dealership to allow for new showroom area and service Maroone Management Services 4250 North State Road 7 MainStreet Project Area $3.6 million   Project is currently under development review approvals from Planning and Zoning Board and City Commission on rezoning. Pending building permit approval
Start
11/1/2014
Complete
5/31/2015
Contact Info GIS Map
SIMONTON COURT TOWNHOMES Construction of one hundred thirty-three (133) townhome units with 2-car garages. Lennar Homes South side of Hillsboro Blvd. west of NW 39th Avenue Unkown   Pending submittal of AA application. Temporary construction trailer permit in building division for review.
Start
12/31/2014
Contact Info GIS Map