Full Map of All Projects

Current City Projects

Sorted by Project Type, Start Date
Legend (Click on specific project type to just show that type)
Project Types
(count)
City of Coconut Creek
(15)
Other Government Agency
(0)
Private Development
(11)
Special Events
(3)
 
Project NameProject DescriptionResponsible PartyLocationCost/
Funding
Potential IssuesStatusImportant
Dates
Contact
Info
Map
TREE CANOPY REPLACEMENT PROGRAM Replacing street trees in neighborhoods througout the City Sustainable Development City-wide $200,000 Project completion anticipated in March. Staff to meet and assess the next few neighborhoods for quantities and species missing, and prepare a new bid.
Start
2/1/2011
Contact Info GIS Map
OVERHEAD TO UNDERGROUND UTILITY LINES, PH 2 & 3 Placing utilities lines underground - including FP&L, Comcast and AT&T Utilities and Engineering Phase III:On Cullum Rd from Lyons Rd w. to SR 7, NW 54 St, from Cullumn Rd so. to NW 40th St. $1,970,000 - Phase II - $1,175,000 Phase III Phase II- Completed Phase III-FPL Agreement approved 12/13/12. FPL awarded project to Davco 3/25/13. FPL's contractor pulling underground lines. City's contractor (PLA Electric) working to transfer aerial service lines. FPL tentatively scheduled service activation on 2/3/14 of the transformer for the traffic signal on NW 54th Avenue approximately 200 feet north of NW 40th Street.
Start
7/6/2011
Complete
12/31/2013
Contact Info GIS Map
SINGLE STREAM RECYCLING Grant program with funds to go towards outreach, education, and implementation of multi-family and commercial recycling pilot programs. Public Works city-wide $599,000 (Broward County Grant) County approved additional grant funds beyond 7/13.Commercial recycling carts delivered. Working with Parks & Recreation staff to select and purchase recycling containers for various parks.
Start
9/1/2011
Contact Info GIS Map
EDUCATION CORRIDOR (MEDIANS) Medians, landscaping, irrigation. Sustainable Development Department Coconut Creek Parkway from Banks Road to Broward College entrance on east. $1,500,000 Mostly funded through FDOT grant Final construction cost $1,160,152 Final CEI cost 135,393 Total 1,295,546.22 FDOT grant (reimbursed) $1,010,582 FDOT non-participating (city) $ 284,964 Final reimbrusement received - Project Completed.
Start
9/1/2011
Complete
12/31/2013
Contact Info GIS Map
ELECTRIC VEHICLE CHARGING STATIONS This project involves the installation of Electric Vehicle Charging Stations at select City Facilities to provide local re-charging facilities and to further promote the use of alternative fuel vehicl Public Works Throughout the City   Vendor selected Govt Center site to install the 1st station once approved by the City Commission Installation of vehicle charging station is completed. Appropriate signage has been ordered but not yet received. Working with Community Relations to develop press release and video.
Start
1/9/2012
Complete
9/30/2013
Contact Info GIS Map
CITY HALL RENOVATIONS Renovations to IT/Sustainable Development area and Police and grading lighting and HVAC system in other areas of City Hall Public Works City Hall $500,000 The project involves the closing in of three offices in the IT/Sustainable Dev. areas and upgrading the lighting and HVAC system in SD and HR areas of City Hall Preparing to begin ceiling, lighting, and HVAC work within the next few weeks. Will begin relocating employees out of work area to temporary locations on or about February
Start
1/21/2012
Contact Info GIS Map
FIRE STATION 94 REMODEL Remodeling interior of existing Fire Station 94 to accommodate current needs, including dormitory, kitchen, offices and work space. Public Works 4555 Sol Press Boulevard Coconut Creek 33073 $240,000   Currently working on obtaining temporary trailer to house fire staff while renovations are taking place.
Start
1/2/2013
Complete
9/30/2014
Contact Info GIS Map
EARL JOHNS PROPERTY REMODEL Project involves rehabilitation of the Earl Johns House to prepare for resale and/or renting of property. Includes but is not limited to remodel of kitchen and one bathroom, new flooring (carpet and tile), celing and screen repairs, and painting. Public Works 651 NW 45th Avenue $55,000   Clean up complete. Awaiting final decision on property use/disposition before undertaking further renovations
Start
6/1/2013
Contact Info GIS Map
TEMPORARY FIRE STATION (ROWE CENTER REMODELED) Remodeling Rowe Center for a temporary fire station until new South Creek Fire Station is completed. Public Works 900 NW 43rd Avenue $162,000   Building Permit has been issued and construction is underway
Start
6/3/2013
Complete
3/31/2014
Contact Info GIS Map
SABAL PINES PARK SERVICE ACCESS PATH This project involves the replacement of the existing 5 foot wide asphalt sidewalk with a 12 foot wide reinforced concrete multipurpose path and includes other site amenities such as interpretive signs, benches, bike racks, and trash/recycling receptacles. This project is partially funded with an FDEP grant Public Works 5005 NW 39 Avenue $246,000   Construction continues with anticipated completion in mid to late February.
Start
9/1/2013
Complete
3/31/2014
Contact Info GIS Map
CARPET REPLACEMENT PROGRAM Project addesses the need to replace casrpeting in City facilities that has reached an unacceptable condition due wear and tear, permanent staining or damage. Public Works $20,000 Proposed replacements for FY 14 inlcude the Community Center meeting rooms A,B and C (1100 Lyons Road) Carpet selection has been made. Scheduling installation for some time in the month of May based on Parks and Recreation request.
Start
9/23/2013
Complete
2/28/2014
Contact Info GIS Map
EDUCATION CORRIDOR (SIDEWALKS) Phase III The project includes sidewalks, landscaping, irrigation, hardscape, and transit facilities on either side of Coconut Creek Parkway between the Turnpike and Banks Road. Utilities and Engineering Coconut Creek Parkway, Banks Road to Broward College entrance on east. $1,897,149 grant FDOT (-CEI) City: $521,394 LAP Agreement signed by City and submitted to FDOT for approval. Start of construction work by 1/13/14. Sidewalk installation in progress from Wynmoor gate east to Lyons Road. No other known issues at this time.
Start
9/26/2013
Complete
7/30/2014
Contact Info GIS Map
SHADE STRUCTURE INSTALLATION This project provides for the installation of shade structures at 8 different locations throughout the City including the Community Center Playground, Sabal Pines Park West Playground, Gerber Park Bleachers, Lakeside Park Bleachers, and Hosford Park Bleachers. Public Works Citywide $286,000   Waiting on proposals from vendor. Researching potential to piggyback a St. Johns County contract for installation.
Start
10/1/2013
Complete
9/30/2014
Contact Info GIS Map
SHADE AWNING REPLACEMENT This project provides for the replacement of shade awnings that are torn, faded and beyond repair. The Community Transportation storage area awning is scheduled for replacement in FY2014 Public Works $15,000   Currently evaluating proposals.
Start
10/1/2013
Complete
3/1/2014
Contact Info GIS Map
PARKS IMPROVEMENT PROGRAM This project addresses capital rehabilitation needs at various City parks and includes replacement of certain dugout roofs, fencing fabric, and scoreboards, as well as, construction of dugout utility buildings/sheds, and the painting of the Community Center Bridge. Public Works Various projects will take place at Sabal Pines Park (5005 NW 39 Ave), Gerber Park (4715 NW 30 St), Lakeside Park (5555 Regency Lakes Blvd), and the Community Center (1100 Lyons Road). Budget: $219,000   Installation of two scoreboards at Sabal Pines Park has been completed. Purchase Requisition has been entered for epoxy coating of the Community Center Bridge
Start
11/1/2013
Complete
9/30/2014
Contact Info GIS Map
CARLS COMPLEX Requesting Berm removal and pedestrian Improvements at Carls Furniture site. Steve Fields, owner 6810 N. State Road 7 Unknown Start date unknown Berm work partially completed. Awaiting final plan revision and inspections
Contact Info GIS Map
LONG PINES CONDOMINIUMS Rezoning and site plan approval to change the property from office zoning to residential zoning and construct approximately 45-50 units. Jordan Klemow-Kemlow at 5150 Hillsboro, Inc. 5150 Hillsboro Blvd - currently vacant Unknown   Active Construction
Contact Info GIS Map
BROADSTONE CYPRESS HAMMOCKS Rezoning and site plan approval for 396 rental apartments and a greenway link along Hillsboro Blvd. to connect Long Pine North greenway to pedestrian trails in the Saw Palmetto Preserve. Alliance Residential 5335 W Hillsboro Blvd (former Hillsboro Mobile Home Park (vacant) not available   Active construction. Leasing of Phase one has begun.
Start
4/1/2012
Complete
5/31/2014
Contact Info GIS Map
CASA PALMA Rezoning and site plan approval for 14 three story buildings, a clubhouse and associated recreational facilities for 350 multi-family luxury rental units. ZOM Florida, Inc., 200 E. Broward Blvd., Ft. Laude 6320 N. SR 7 not available   Engineering and building permits issued.
Start
1/1/2013
Complete
8/1/2014
Contact Info GIS Map
ELITE I AT JOHNSON TECHNOLOGY PARK Elite Aluminum requesting site plan approval for 45,500+ s.f. of industrial manufacturing facility to produce their patented fold out temporary structures. Butters Construction and Development 5275 Johnson Road unknown   Active Construction
Start
5/1/2013
Complete
3/1/2014
Contact Info GIS Map
HAMPTON INN AT COCONUT CREEK Rezoning and site plan approval for 105 room limited service hotel. Coconut Creek Hospitality Group, LLC East side of SR7,immediately north of Sawgrass Expressway-currently vacant Est.. value of construction unknown   Active Construction.
Start
5/15/2013
Complete
5/31/2014
Contact Info GIS Map
COCONUT CREEK MEDICAL CENTER Site plan approval for 21,760 sq.ft., 2 story medical office building with doctors offices and outpatient care facilities. Florida Shores Bank SE-Mike Friedman 4890 North State Road 7, corner of Alexandra Blvd and State Road 7. Unknown   Engineering permits issued. Building permits issued. Active Construction.
Start
10/1/2013
Complete
10/1/2014
Contact Info GIS Map
GUNTHER VOLKSWAGEN Proposed expansion to allow for additional service area, expand pre-owned sales building and construct parking structure for inventory. Gunther Motor Company 4300 North State Road 7 (MainStreet Project Area) $7.3 million   Initial construction has begun. Building permit still under review.
Start
10/1/2013
Complete
6/1/2014
Contact Info GIS Map
PROMENADE AT COCONUT CREEK: SILVERSPOT THEATRE Proposed modifications to site to allow for a movie theater (Silverspot Theatres) and adjustments to previously approved retail buildings design and layout. Garrison Investment Group SW corner of Lyons Road and Wiles Road. $11.3 million   Under Construction
Start
11/1/2013
Complete
3/1/2014
Contact Info GIS Map
BANK UNITED Requesting site plan and special land use approvals for a modification to the site plan and architecture of an existing outparcel building at Coconut Creek Plaza to add drive thru facilities for a new bank tenant. Byron Wilson-Bixmor Property Group 4801 Coconut Creek Parkway-NW corner of Lyons Rd and Coconut Creek Parkway Unknown   Active Construction.
Start
12/31/2013
Contact Info GIS Map
ALTIS AT COCONUT CREEK -formerly known as BEL LAGO Rezoning and site plan approval for 270 luxury rental apartments (12 residential buildings) and 2 commercial outparcels. Altman Development Corporation 5401 Wiles Road not available Start dates: Residential phases - April 2014 Commercial phases - see entry for Public Storage Active Construction.
Start
4/1/2014
Complete
8/31/2014
Contact Info GIS Map
HOME GROWN CONCERT SERIES Free concert series runs from October thru June, occurs the 2nd Friday or Sunday of the month. Different local musical groups are featured each month. Public to bring lawn chairs or blankets for seati Parks & Recreation Dept Concert held at the Band Shell located behind the Coconut Creek Community Center at 1100 Lyons Rd, corner of Lyons Rd and Coconut Creek Parkway. Bring lawn chairs or blankets. Coolers are welcomed, however, a food truck will be on site selling fool and beverages   Traffic should not be affected in any way. There is plenty of parking available at the Community Center. The Home Grown Concert Series on Friday, March 14, 2014, Features Joel DaSilva and the Midnight Howl. This band performs high energy Blues, Rock and Soul. The concert is 7:00 PM to 8:30 PM. Logon www.coconutcreek.net/events for complete schedule.
Start
10/11/2013
Complete
5/31/2014
Contact Info GIS Map
MOVIE IN THE PARK SERIES Free movie series runs from November thru April and occurs the third Friday of the month. Each month is a different PG or G rated movie. You may bring lawn chairs or blankets. Coolers are welcomed, however a food truck will be on site selling foold and beverages Parks and Recreation Various park locations. The movie will be shown in a different city park each month.   The movie in the park series will begin a new season on Friday, 11/16/13. The next Movie in the Park will be Friday, March 21, 2014. The movie will be DESPICABLE ME2, rated PG. It will be in the park behind the Community Center at 1100 Lyons Road. The movie begins at 8:00 PM. Please visit us at www.coconutcreek.net/events for complete schedule
Start
11/16/2013
Complete
4/30/2014
Contact Info GIS Map
12TH ANNUAL BUTTERFLY FESTIVAL Annual city celebration of our anniversary. Free event featuring live music from two stages, rides, food, Business Expo and Fireworks Display. Parks and Recreation Sabal Pines Park, 5005 NW 39 Avenue.   Sabal Pines Park will be closed to the public beginning Thursday, February 20, 2014 to begin set up and will stay closed until Monday, February 24, 2014, for breakdown. The event is from 1:00 pm to 8:30 pm. Parking is limited at Sabal Pines park, however shuttle buses will be provided to the public to park at Monarch High School, next to the Promenade on Wiles Road and the Recreation Complex at Johnson Road and Lyons Road behind the fire house.
Start
2/22/2014
Complete
2/22/2014
Contact Info GIS Map

Future City Projects

Sorted by Project Type, Start Date
Legend
Project Types
(count)
City of Coconut Creek
(12)
Other Government Agency
(0)
Private Development
(12)
Special Events
(0)
 
Project NameProject DescriptionResponsible PartyLocationCost/
Funding
Potential IssuesStatusImportant
Dates
Contact
Info
Map
LYONS ROAD MEDIANS SECTION II and III This project involves enhancements to the medians along Lyons Road between the Sawgrass Expressway and Copans Road including landscaping, brick pavers, and irrigation upgrades. Public Works Lyons Road between Copans Road and the Sawgrass Expressway Approx. $1,500,000 ($1,174,000 grant from FDOT) FDOT LAP funding Contractor has started the disconnection of the existing Winston Park irrigation system. Tree removal from southern portion of the project completed.
Start
8/1/2012
Complete
9/1/2014
Contact Info GIS Map
NW 74TH STREET PASSIVE PARK This project involves the development of the NW 74th Street property utilizing a combination of City and grant funds. Under the terms of the grant, the proposed park is designated as a passive park. In FY 2013, the City installed a pathway that runs along the perimeter of the park. Public Works $175,000   Completed review of 75% plans and forwarded comments to the Consultant. Anticipate having 1005 plans by the beginning of March 2014.
Start
2/1/2013
Complete
9/30/2014
Contact Info GIS Map
NEW FIRE STATION (South Creek) Project involves the construction of a new Fire Station at Windmill Park. The proposed station will be a two story building with 3 bays and approximately 10,000 sq.ft. in total size. Public Works Windmill Park, 700 Lyons Road $3,000,000 There may be occasional park ingress/egress issues once it is under construction. Other than that, do not anticipate any unusual circumstances. Reviewed first set of preliminary drawings, made comments, and returned to architect for further modifications.
Start
3/1/2013
Contact Info GIS Map
SABAL PINES PARK YARD RETROFIT Convert Public Works Sabal Pines Park maintenance yard into Utility Maintenance Compound Utilities and Engineering Sabal Pines Park $200,000 Design Contract date: 3/13 Anticipated Construction Start: 8/13 Anticipated Construction Completion: 3/14 Project on hold due to potential alternatives.
Start
3/31/2013
Complete
3/31/2014
Contact Info GIS Map
TELEMETRY-SCADA SYSTEM IMPROVEMENTS Install new telemetry equipment (cellular) and program the Supervisory Control and Data Acquisition (SCADA) and Program Logic Control (PLC) system. Utilities and Engineering City entire wastewater lift station sites and water storage tanks. $1,020,300   Panel construction is approx 50% complete. Contractor submitted RTU and pump drawings to City's Consultant for approval. Witnessed factory test of equipment is tentatively rescheduled for two days, Feb 5 to 6. Tresting of two cellular modems was successfully completed.
Start
6/10/2013
Complete
7/4/2014
Contact Info GIS Map
COPANS ROAD EAST MEDIAN IMPROVEMENTS This project provides for paver, landscape, and irrigation improvements for the Copans Road medians between Lyons Road and the Turnpike. Public Works Lyons Road to the Florida Turnpike $525,000   Purchase Order was issued to Miller Legg and Associates. Currently in design phase.
Start
9/1/2013
Complete
12/31/2014
Contact Info GIS Map
CITY ENTRYWAY SIGNS Project addresses the design and installation of new City Entryway signs at fifteen locations throughout the City in accordance with the Citys Amenities package. Public Works $290,000 This project is budgeted over several years with the first installation(s) in FY 14. Currently reviewing first draft design submittal.
Start
10/1/2013
Complete
9/30/2018
Contact Info GIS Map
BUS SHELTER PROGRAM This project provides for the installation of new and or replacement bus shelters as needed throughout the city. Shelters shall be consistent with the citys Amenities Package. Public Works Citywide $30,000   Purchase Requisition entered to replace one shelter adjacent to Wynmoor on Lyons Road.
Start
10/1/2013
Complete
9/30/2014
Contact Info GIS Map
CULLUM ROAD STREETLIGHT INSTALLATION This projet provides for the installation of new street lights along Cullum Road between State Road 7 and NW 40 Street required as part of the electric service undergrounding project and in accordance with the Citys amenities package. Public Works Between SR 7 and NW 40 Street     Received final plans which have been distributed to our vendor for pricing.
Start
10/21/2013
Complete
5/31/2014
Contact Info GIS Map
WILES ROAD RECLAIMED WATER METERING STATION Construction of reclaimed water metering station and tie-in into Broward County reclaimed water main. Utilities and Engineering SE Corner of Wiles Road and 39th Avenue $100,000 Funding Source: 42915366828 Changes in the electrical design by the Consultant to incorporate solar power are in progress. Preparation of permit documents to work in Groward County's ROW's is in process. Construction is tentatively scheduled to start on 3/3/14.
Start
12/3/2013
Complete
5/16/2014
Contact Info GIS Map
RECLAIMED WATER MAIN EXTENSION ON LYONS RD Design of reclaimed water main extension on Lyons Road from Wiles Road to Serko Boulevard Utilites and Engineering On the east side of Lyons Road from Wiles Road to Serko Boulevard $120,000- 50/50 w/BC   Commission approved design services for the project on January 23, 2014.
Start
2/6/2014
Complete
10/31/2014
Contact Info GIS Map
NW 42 AVE. TRAFFIC CALMING IMPROVEMENTS Replacement of existing asphalt sidewalk with concrete sidewalk, drainage improvemnets, traffic device installations, and pedestrian improvements. Utilities and Engineering On the west side of 42nd Avenue from 30th Street to approximately 65 feet south of the bridge $95,000.00 Fund: 11715416856   Bid submittals are under review.
Start
3/3/2014
Complete
6/20/2014
Contact Info GIS Map
AMERICAN TOP TEAM TRAINING FACILITY Applicant is requesting to construct a two story mixed martial arts facility, dorm style living units and associated site improvements. Daniel Lambert 5000 State Road 7 Unknown   Initial submittal of site plan application currently under DRC review.
Contact Info GIS Map
THE VILLAGE OF MARBELLA Approved site plan to allow for commercial, office, 150 room hotel, and 764 residential units. Pompano Imports, Inc. North side of Sample Road, jsut est of Lyons Road (MainStreet Project Area) $227 million (2008 costs) Start date unknown Approved-legal issues have project on hold
Contact Info GIS Map
SAW PALMETTO NATURAL AREA Site Plan Modification-Requesting addition of parking, picnic shelters, walkways, perimeter fencing, maintenance shed, landscaping and revoval of exotic plant material. Broward County Parks and Recreation 4950 NW 71st Place Unknown Anticipated Start date - Unknown Anticipated Completion - Unknown DRC review has been completed. Approval letter sent to applicant on Feb. 12, 2013.
Contact Info GIS Map
HILLSBORO BAPTIST CHURCH and EDUCATIONAL FACILITY Requesting zoning modification and site plan approval of a multi-phased project which includes K-12 grade school, recreational space, and church facilities. First Baptist Church at Hillsboro, Inc. 5100 West Hillsboro Blvd - primarily vacant Est. value of Construction   Property owner considering a reduced development scope prior to re-submittal.
Contact Info GIS Map
GRIFS WESTERN STORE Site plan application proposing a new 16,000 square foot commercial building. Alfred Griffin 5730 N State Road 7 not available   DRC comments emailed to applicant 2-5-13. Engineering, landscaping and zoning - hold status pending clean-up. Requires another re-submittal.
Contact Info GIS Map
McDONALDS AT TOWNSHIP PLAZA Requesting to remodel the interior and exterior of the building.Changes also include the addition of an outdoor dining area in place of playground. Previously proposed changes to the drive-thru and parking lot have been withdrawn. McDonalds USA, LLC Agent: Mark Paules Township Plaza 4200 West Sample Road Unknown   In DRC review process. Revised plans to be submitted in January.
Contact Info GIS Map
SOUTH FLORIDA ACADEMY OF LEARNING Requesting a Special Land Use approval to operate a private school for children K-12 with speial learning needs. the school would utilize the existing building. South Florida Academy of Learning- Scott Backman 3700 Coconut Creek Parkway unknown   Special Land Use application scheduled for the January 9 Planning and Zoning Board meeting.
Start
1/1/2014
Complete
3/31/2014
Contact Info GIS Map
PUBLIC STORAGE AT ALTIS Four Story self-storage building Public Storage One Inc 5479 Wiles Road $6.4 million   Building permit currently under review.
Start
1/1/2014
Contact Info GIS Map
NORTH BROWARD PREP SCHOOL School is requesting a rezoning and replat as required by a pre-annexation agreement with the City. Property to be zoned from agricvultural to Community Facility to be consistent with the exidting use. Plat will unify multiple parcels under one plat name and delineate use dedications. North Broward Prep School-agent Scott Backman 7600 Lyons Road No construction proposed with these applications   Rezoning and plat application currently under DRC review.
Start
1/1/2014
Complete
5/30/2014
Contact Info GIS Map
U-HAUL STORAGE AND RENTAL FACILITY Requesting site plan for a modification to the site plan and architecture of an existing self-storage bldg. Requesting the special land use of truck rental for this location. U-Haul of Florida 5431 Johnson road - East of SR 7 unknown   Site plan and special land use applications currently under DRC review.
Start
4/1/2014
Complete
7/31/2014
Contact Info GIS Map
ABC PRESCHOOLS Requesting a Special Land Use approval to operate a child daycare center at Winston Park Plaza. The school would utilize the vacant bay at the south end of the plaza. Also requesting to add an outdoor play area in the rear of the building. Aunt D Preschools 5331 Lyons Road Unit A-1 unknown   Special Land Use application currently scheduled for February 12 P & Z Meeting to seek Board recommendation prior to traveling to the City Commission. Site modification application for play area is currently under DRC review.
Start
5/1/2014
Contact Info GIS Map
MIDTOWN RESIDENCES AT COCONUT CREEK Proposed 308 midrise residential units within the MainStreet Project Area. Residential program includes a mix of studios, 1, 2, and 3 bedroom units. Florida Crystals Corporation 4800-4900 block on Sample Road (MainStreet Project Area) $32 million   Project is currently under development review and requires formal public approvals from Planning and Zoning Board and City Commission on rezoning, site plan, and plat applications.
Start
9/1/2014
Complete
12/31/2016
Contact Info GIS Map